CCM Architecture : : Construction

Custom design and construction of beautiful homes, vacation cabins and remodels or additions of existing homes.

Friday, July 28, 2017

Shower floor tile


Posted by CCM Architecture + Construction at 4:11 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Clear vertical grain Douglas Fir trim



Posted by CCM Architecture + Construction at 4:10 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

River side wall complete.





Posted by CCM Architecture + Construction at 4:08 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Thursday, July 27, 2017

1x4 clear vertical grain Western Red Cedar siding.



Posted by CCM Architecture + Construction at 9:19 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Interior trim starts.


Posted by CCM Architecture + Construction at 9:11 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Bathrooms getting close.



Posted by CCM Architecture + Construction at 9:07 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Friday, July 21, 2017

Knee braces and barge rafters






Posted by CCM Architecture + Construction at 8:09 AM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Tile continues



Posted by CCM Architecture + Construction at 8:07 AM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Wednesday, July 12, 2017

Tile prep and install





Posted by CCM Architecture + Construction at 4:46 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

Blog Archive

  • ►  2021 (1)
    • ►  April (1)
  • ►  2020 (5)
    • ►  November (3)
    • ►  June (1)
    • ►  January (1)
  • ►  2019 (37)
    • ►  September (2)
    • ►  August (3)
    • ►  July (2)
    • ►  June (8)
    • ►  May (8)
    • ►  April (9)
    • ►  March (5)
  • ►  2018 (6)
    • ►  January (6)
  • ▼  2017 (48)
    • ►  December (1)
    • ►  November (2)
    • ►  October (9)
    • ►  August (3)
    • ▼  July (9)
      • Shower floor tile
      • Clear vertical grain Douglas Fir trim
      • River side wall complete.
      • 1x4 clear vertical grain Western Red Cedar siding.
      • Interior trim starts.
      • Bathrooms getting close.
      • Knee braces and barge rafters
      • Tile continues
      • Tile prep and install
    • ►  June (13)
    • ►  May (7)
    • ►  March (1)
    • ►  February (1)
    • ►  January (2)

Contact Form

Name

Email *

Message *

Charles C. Mellon
Architect : : Builder
206 595 9690
charles@ccmarchitecture.com
www.ccmarchitecture.com

About Me

My photo
CCM Architecture + Construction
View my complete profile
Simple theme. Powered by Blogger.